A Discrete-event Modeling of ARGESIM Benchmark C20 ‘Complex Production System’ using Flexsim Simulation Software

Simulation Notes Europe SNE 22(1), 2012, 55-60
DOI: 10.11128/sne.22.bn20.10119

Abstract

ARGESIM proposes a new benchmark description ARGESIM C20 ‘Complex Production System’. This article describes a first implementation of this benchmark by use of the simulation software Flexsim. The simulation model is controlled by a heterarchical control algorithm implemented in Flexsim, which covers routing and scheduling and is based on reservations. The results are presented according to the requirements of the benchmark description.